The Workload View is your central hub for capacity planning and resource allocation across your team.

Getting Started:

The Workload View gives you a real-time view of who is working on what, when, and how much availability they have. It brings together work plans, time off, and team capacity - all into a single heat map so you can make informed staffing decisions.

This view works hand-in-hand with the Planner view. Workload shows the member-level view (think "W" flipped upside down = "M" for Members). Planner shows the project-level view. Both are composed of the same work plans β€” just viewed through a different lens.

This is the best place to go when you want to answer questions like:

  • Who is available to take on new work this week or next?

  • Who is overbooked and needs help?

  • When is someone going on PTO?

  • How much of the team's capacity is planned out for the next 30 days?

  • What projects is a specific person working on?

  • Can we redistribute work to balance the team?

Workload screen showing member capacity percentages in a weekly timeline for October–December 2026; a red arrow points to the top-left navigation menu beside Workload. Visible: Workload, 145 Members, Oct – Dec 2026, Months, Total Capacity, Ace Ventura.

What you can see in Workload:

The Workload View displays team members in rows on the left, with a timeline calendar stretching to the right. A color-coded heat map fills each cell to show capacity at a glance.

Accessing Views

Switch between prebuilt views without leaving the space, so you can check capacity, work plans, or open roles from wherever you already are. Click the menu icon next to the space name to see the views you've added, or to add new ones from the All views picker. The same views are available from both Workload and Planner.

Planner Views menu is open beside a workload planning timeline, with a red arrow pointing to the selected Workload view. Visible: Planner Views, Add view, Workload, Work Plans, Open Roles, Project Planner.

πŸ‘‰ Learn more about Views in Workload

Heat Map

The heat map provides an instant visual of team capacity. Each cell is color-coded to show how much of a member's time is planned for a given period

  • By default, green means low utilization, yellow means over 50%, and red means at or near full capacity

  • A red triangle chip appears when a member exceeds 100% capacity

  • Color coding and ranges are customizable per user

πŸ‘‰ Learn more about Heat Map & Settings

Member Selection & Filtering

Select which team members appear in your workload view. Filter by department, role, office, skills, and more to focus on the people you need to see.

  • Search by name or use the Select All option

  • Layer multiple filters (e.g., department + skill level)

  • Group members by department, role, office, or other attributes

πŸ‘‰ Learn more about Member Selection & Filtering

Work Plans

A work plan is a scheduled amount of time assigned to a member for a specific project or phase. Work plans are the building blocks of both Workload and Planner.

  • Create plans by percentage of day/week, hours per day/week, or total hours

  • Lock in your constant (hours, percentage, or total) and adjust dates freely

  • Add descriptions, mark plans as tentative, and leave comments with @mentions

πŸ‘‰ Learn more about Work Plans

Managing & Modifying Work Plans

Once work plans are created, they are easy to adjust on the fly. Drag, drop, split, copy, and reassign plans - with a few simple clicks.

  • Drag and drop to move plans across the timeline or to other members

  • Extend or condense plans by dragging the edges

  • Split a plan into two, copy it for another member, or delete it

πŸ‘‰ Learn more about Managing Work Plans

Time Off & Holidays

Log PTO and vacation time so the team can see when members are unavailable. Company-wide holidays are set by Account Admins and will display automatically.

  • Time off plans reduce capacity and shift non-dependent work plans

  • Company holidays appear as gray lines across all members

πŸ‘‰ Learn more about Time Off & Holidays

Display Settings

Customize what information appears in your workload view. Toggle member details, timesheet data, tentative plans, and row height β€” all personal to your account.

  • Show or hide role, capacity, bill rate, and timesheet numbers

  • Condense row height to see more members at once

  • Toggle tentative plans and archived work plans on or off

πŸ‘‰ Learn more about Display Settings

Activity Log

Track every change made to work plans. See who created, edited, or moved a plan, and when.

  • Filter by project, editor, or date range

  • Available at the space level and within individual work plans

πŸ‘‰ Learn more about Activity Log


Best Practices

  • Start planning early β€” Get to 75% planned capacity for the next 30 days as your onboarding goal

  • Use weekly meetings β€” Pull up the workload space during capacity meetings to make real-time adjustments

  • Remember it's a plan β€” Plans are not set in stone. Move, split, and adjust as priorities change

  • Condense your view β€” Use the row height toggle to see more team members at once during meetings

  • Sort by availability β€” Use sorting to quickly identify who can take on new work