---
title: "Integration Sync Log"
description: "A record of data that has synced into Mosaic from your ERP so you can verify and troubleshoot integration activity."
url: https://support.mosaicapp.com/en/articles/718-integration-sync-log
collection: "Widgets"
updated: 2026-09-22
language: en
---

# Integration Sync Log

A record of data that has synced into Mosaic from your ERP so you can verify and troubleshoot integration activity.

The Integration Sync Log widget shows a log of the data that has come into Mosaic from your connected ERP integration. It is only accessible by Admins within your Mosaic account.

![](https://staticfiles.gleap.io/ghelparticle/gwroPlJ2Zl3zLfmcMxS1Bz1uMyGbZPoy623eF4gPpRk40uEm7qP8nq5Mx6Tua3b3QxKzvfeJSiG.png)

### This is the best place to go when you want to:

-   Verify that a new project has synced in from your ERP
    
-   Check when the last sync ran
    
-   Investigate whether a missing project, phase, or time entry is a sync issue
    
-   Confirm that time entries from your ERP are appearing in Mosaic
    

* * *

### What you see

The Integration Sync Log shows a timestamped list of recent sync activity, including:

-   **What was synced** — projects, phases, members, time entries, or other data types
    
-   **When it synced** — date and time of each sync event
    
-   **Sync status** — whether the sync completed successfully or encountered an issue
    

* * *

### Important notes

-   This widget shows **incoming data only** — Mosaic does not push data back to your ERP, so you will not see outgoing sync events
    
-   If data you expect to see in Mosaic is not showing up, check this log first to see whether a sync has run recently
    
-   For persistent sync issues, contact your admin or Mosaic Support
    

* * *

### Best practices

-   **Check this first when something is missing** — Before assuming a project or time entry does not exist in Mosaic, verify in the sync log whether the data has had a chance to come through
    
-   **Admins should review this periodically** — Regular check-ins on the sync log help catch integration issues early before they affect planning or reporting
