---
title: "Workload Display Controls"
description: "Learn How to Tailor Workload Settings to Fit Your Needs"
url: https://support.mosaicapp.com/en/articles/650-workload-display-controls
collection: "Space Settings"
updated: 2026-10-22
language: en
---

# Workload Display Controls

Learn How to Tailor Workload Settings to Fit Your Needs

## Overview

Workload Space Display Controls allow you to configure and customize the Space to your preferences. These settings are personal — changing them only affects your view, not anyone else's. Some default values are set by your Account Admin, but each user can override them.

![The Display Controls panel is open over a heatmap schedule, and a red arrow points to the sliders control in the top-right toolbar. Visible: Nov, Display Controls, MEMBERS, Member Role, Member Capacity, Bill Rate.](https://staticfiles.gleap.io/ghelparticle/htidi1lfXGU5LpIoQWQlH5D6cYtdpIPgVVx8eEFr7fWFKuSjj8Rx1Wj3H5T0xmjZYOF8VpQgCcM.png)

## What You See

Controls are accessed from the **three-dot icon** on the top right of the Workload space. The settings panel includes:

-   **Member Controls** — Control what member information is shown
    
-   **Schedule Controls** — Show or Hide the Parent of the Subphase
    
-   **Work Plan Controls** — Set Default Planning Parameters
    
-   **Workload Controls** — Tweak the overall Space’s display
    

## Member Display Controls

![](https://staticfiles.gleap.io/ghelparticle/dxKsrfRQmlzclXacETpS2YxPy8A56Y0IYoT2knebO2fQq6d1KaO3vskN5L2k3L8G8eFuBkZGp0D.png)

-   **Member Role** — Toggle the member's role underneath their name on or off
    
-   **Member Capacity** — Shows their weekly capacity (for example, 40h/wk) underneath their name.
    
-   **Bill Rate** — Shows the member's bill rate. Restricted to Budget Managers and Admins, and requires an extra click to reveal the number.
    

![](https://staticfiles.gleap.io/ghelparticle/tqT7YL7V2IE7WhOurnUqU3ESaPiYAX0geEFKTj1HLtUuafDLgWViKPkQeD2mEM5wHm1bT2S3OW1.png)

## Schedule Display Controls

-   **Parent of a Subphase** - This allows you to show or hide the parent of the Subphase on a work plan
    
    -   _Toggled On_
        
        ![](https://staticfiles.gleap.io/gattachments/4r1CfZUAItsXIPHyvhz9faEyxFcfLIVryqjHA930ajg0tu1Ire5k2JothIJdw4LSu0ggKrinH4Z.png)
        
    -   _Toggled Off_
        

![](https://staticfiles.gleap.io/gattachments/GMM7xPjboZgIHZyzsMUVnCXHf4p4AdlR2z3UuW5K4CmbwZeEpfnZKwTXfWyCeNxAt7iQlhAUwRT.png)

## Work Plans Display Controls

![Work Plans settings section shows toggles for Project Lanes, Tentative Work Plans, Work Plan Requests, and Archived Work Plans, plus dropdowns for lane order and planning interval. Visible: WORK PLANS, Project Lanes, Lane Order, Project Name, Tentative Work Plans, Work Plan Requests.](https://staticfiles.gleap.io/ghelparticle/cuOKkjFtXcZ51fhHvojjpC44Lo7JS9QSwWts02qbf4vu2wpQkfRIajHCycAQ5BPWkLgZ9LFLRQw.png)

-   Project Lanes — Project Lanes switches the Workload layout from one row per member to one row per project, with everyone staffed on that project shown side by side on the same row.
    
    -   _Use Project Lanes to see a single project's full staffing at a glance, instead of finding that project inside each member's row._
        
    -   _Sort lanes by_ **_project name_**_,_ **_project number_**_, or_ **_earliest planned start_**_._
        
    -   **How to turn on Project Lanes:**
        
        1.  _Open the display settings panel in the Workload space._
            
        2.  _Switch the layout toggle to_ **_Project Lanes_**_._
            
        3.  _Choose a sort order: project name, project number, or earliest planned start._
            

![Workload calendar with member capacity and project lanes; Display Controls is open on the right with the Lane Order menu expanded. Visible: Workload, 147 Members, Sep - Nov 2026, Months, Display Controls, MEMBERS.](https://staticfiles.gleap.io/ghelparticle/gXb6hUmf5RDcF6GPs8e41mGYi8x1lLdZbcwcnHqr2AnmNdD8qSRam3A2xXUQFo0lm4n3WrtL1Xs.png)

-   **Tentative Plans** — Show or hide plans marked as tentative. Use this to toggle "what-if" scenarios on and off to quickly review capacity
    
    -   _Toggled On_
        
    
    ![](https://staticfiles.gleap.io/gattachments/Z14R17SwWIF9iQbn7Txz8l5NshJ0iAXNTYjbEb0nPwxRlq8HSfwDyv5JSnpic1HB8wPKT2Otp2A.png)
    

-   _Toggled Off_
    
    ![](https://staticfiles.gleap.io/gattachments/cpCeSM7nrhUAc68cV4updDoaos8C3TTh7zHPCFtAKzJKyraixhcLLsJPnQJWYg0y0Iv7sZPkDJr.png)
    

-   **Archived Work Plans** — Show or hide work plans that have been archived
    
-   **Default Planning Interval** — When enabled, new work plans default to weekly scheduling _(hours per week or % per week)_; with date selections also adjusting to Monday through Sunday Increments. If you plan in full-week blocks, this is a great option
    

![](https://staticfiles.gleap.io/gattachments/G4oMSu48dU3yil0RVi7GUv1RJSsmeZzPmDuHeeyrF1lrYBkGLwriz5nIHCrX5zWOUkRqf1MvxkI.png)

## Workload Display Controls

-   **Heatmap Colors** — While set to your Organizations Default, the colors can be adjusted to preference.
    
    -   Select the pencil icon to adjust the color range or to reverse the color order. The Org Default will always remain at the top of the list.
        
    -   _Account Admins can select the option to Edit % & Org Default, which will open up the Organization Settings._
        
        ![](https://staticfiles.gleap.io/gattachments/ALxfbfSoilz3YUfGa1auF5o7NX1nX3DJQQC6zmk170G54dHSkT5OHvdpSMG2WMoCLCAOy5JF1yZ.png)
        
-   **Heatmap & Work Plan Display** — While set to your Organizations Default, this setting can be adjusted to show which values appear in your Workload Space. Choose which value by selecting from the drop down menu:
    
    -   Planned Hours: Shows total hours planned in that period
        
    -   Available Hours: Shows how many hours the member has available once planned hours are subtracted from their total capacity. _Great for PM’s and Planners_
        
    -   % of Member’s Capacity: Shows what percentage of the member’s capacity is planned. _Great for Leadership Meetings_
        
    -   % of Member’s Availability: Shows what percentage of the member’s availability is available to plan
        
-   **Capacity Heatmap** — This option will toggle off the Heatmap - and the member’s capacity calculations -completely; showing instead a breakdown of all member assigned work plans:  
    
    ![](https://staticfiles.gleap.io/gattachments/ooMjNhAUmkre23Qaxvpto8DpWWgpWSOrGeTexYO4Ptq8dHneTqwi8nOEiAetnEIxh3vgC2Ui5pK.png)
    
-   **Checkmark at 100% Capacity** — When enabled, any cell where the member is at or above 100% capacity displays a **checkmark** instead of a number. This provides a quick visual scan without needing to read percentages
    
    ![](https://staticfiles.gleap.io/gattachments/OXjRA079QGRLUW7nEAOyt9caU2tiuuXBiB5av6SInpROr0IydtztJQOdFBxsiF7WOtw1A4fSmiM.png)
    
-   **Timesheet Time** — Show or hide logged timesheet hours in the top-left corner of a member's capacity cell and in the heatmap tooltip.
    

![](https://staticfiles.gleap.io/gattachments/WsOFZvUsx1rHnfOCdum7nu1tzhMTantwHMACjJAdobB0QX9tD49yrxeLY0m6LmPxVIEV5ZjzUAz.webp)

## Tips

-   **Condense rows for meetings** — Toggle the 100% view to fit your full team on screen during weekly capacity meetings
    

![](https://staticfiles.gleap.io/ghelparticle/L8BavWUTp1fnovVITfkAwObyI4ljajlHqjFF1p1hCKxixw5kKOgjO3gSJqLg9J3d8wP93ASMHuW.png)

-   **Hide what you don't need** — If everyone on your team has the same capacity and role, turn those toggles off to clean up visual clutter
    
-   **Use tentative toggle strategically** — Create tentative plans, then toggle them on and off to compare capacity with and without the proposed work
    

-   **Match your role** — Leadership tends to prefer % of capacity. PMs and planners often prefer available hours
    
-   **Turn off timesheet time when planning** — It can be distracting during planning sessions. Turn it back on when reviewing actuals vs. planned
    
-   **Reverse the color wave if it suits your thinking** — Some people intuitively think of green as "available" while others think of green as "fully planned"
    
-   **Switch to Project Lanes for a staffing review —** It is a faster way to confirm every open seat on a project is covered than scanning member rows one at a time.
    

* * *

## Related Articles

-   [Workload Overview](https://support.mosaicapp.com/en/articles/644-workload-space-overview.md)
    
-   [Workload Settings](https://support.mosaicapp.com/en/articles/650-workload-display-controls.md)
    
-   [Member Selection and Filtering](https://support.mosaicapp.com/en/articles/645-member-selection-and-filtering.md)
