# How to create a Rate Group and add Rates?

How to create a Rate Group and  add Rates in Org Settings?

**Rate Groups** can only be created by **Admins** through **Organizational Settings > Budget > Rates**.

[Learn more about Access Level](https://support.mosaicapp.com/en/articles/94-admin-permissions.md)

1.  Go to **Organizational Settings > Budget**, then select the **Rates** tab.  
    The **Role** Rate Groups tab will be shown by default.
    
    ![](https://staticfiles.gleap.io/ghelparticle/xDEjih0F7XNTZnfpSfJjPtOALIfiosgtGd62tYnf7RQMKrSSvLNab8F2rjwO9sB4wYhezPnMEfU.png)
    
2.  Rate Groups are currency-specific. The groups displayed correspond to the currently selected currency. Make sure to switch to the desired currency by clicking the currency selector on the top. If the currency is not found on the list, click **Edit Standard Currencies** to open a page to [Org settings > Standards > Rates](https://support.mosaicapp.com/en/articles/306-organization-settings-standard-rates.md) to add new currencies.
    
    ![](https://staticfiles.gleap.io/ghelparticle/qItsuX09jn43PwLd33lh43ymytHGyJUto32FgnS4lpnVAXQh7Ik7yFeB2LGi1tyr0RH0nfAYS1c.png)
    
3.  Click the **\+ Rate Group** button on the top.
    
    ![](https://staticfiles.gleap.io/ghelparticle/7NXAJR3DJLUVK6lTcszPl67U6fBEQ83hzgSKVoMjODy8ygS9UCfjKWnrmegvGGiyNZB55m5wxhV.png)
    
4.  Enter a name for the new Rate Group and click **Done**.
    
    -   **Rate Group names are case-sensitive**, meaning names with different capitalization (e.g., "Design" vs. "design") are treated as distinct within the same currency.
        
    -   Identical Rate Group names can be used across **different currencies**.
        
    
    Rate Groups of the same name is allowed in different currencies.
    
    > **Warning:** If only the system default Rate Group exists, renaming it will change the default name. To add additional Rate Groups, repeat the steps above.
    > These steps also apply to creating **Work Category** Rate Groups.
    
    ![](https://staticfiles.gleap.io/ghelparticle/5OzS6XaU3vgZzeiZvE6w3uFeL1hSPZyl9pYFw7YYdT1rlRHpwjwV1NjOi847BQwmNr1RiEXbG1r.png)
    
    5\. The Rate Group will show on the table.
    
    ![](https://staticfiles.gleap.io/ghelparticle/gkxDDq2pNvSzqsqIL5W4DdiekHUGSAZAiNqPLU0psqkyWAZEKvmKuQJFsuCR3U1uGW6Kd2aBSsg.png)
    

## Add a Role Rate or Work Category Rate to Rate Groups

After creating a **Rate Group**, Roles or Work Categories must be added to it and assigned **Cost Rates** and/or **Bill Rates** for use in Projects. A single Role or Work Category can belong to multiple Rate Groups.

1.  Navigate to **Organizational Settings > Budget > Rates**, select the Role tab or Work Category tab. Click the **+** button next to the desired **Rate Group** name.  
    Select add to only this Rate Group or All the Rate Groups.
    
    > **Warning:** A Role or Work Category can be added to multiple Rate Groups, but only one per Group.
    
    ![](https://staticfiles.gleap.io/ghelparticle/HwdTHZcCydLGRBBz5zmWKFVhQFb8mFpoRaFN3XqYzkKR30eAd1qBQ0yUrOeETufu8H0P92JIMXW.png)
    
2.  Select a single **Role** or **Work Category** to add from the menu. To create a new standard **Role** or **Work Category**, click the **Manage Standard** button in the menu.  
    [Learn more about Org Settings > Standard Roles](https://support.mosaicapp.com/en/articles/305-organization-settings-standard-roles.md)
    
    [Learn more about Org Settings > Standard Work Categories](https://support.mosaicapp.com/en/articles/303-organization-settings-standard-work-categories.md)
    
    ![](https://staticfiles.gleap.io/ghelparticle/Smsu5iPocH9AHi8b64MF4olACzW0hhqSUlRf3R7th4D12rm0ApmNx6JgePm0Q5sTN5eszc4He9a.png)
3.  Once the Role or Work Category is added, click the **Set Rate** button under either the **Cost Rate/Hr** or **Bill Rate/Hr** column. This will open the Rate modal.
    
    Learn more about [Cost Rate](https://support.mosaicapp.com/en/articles/154-member-cost-rates.md) and [Bill Rates](https://support.mosaicapp.com/en/articles/153-member-bill-rates.md)
    
    ![](https://staticfiles.gleap.io/ghelparticle/wtHxHngENhTx4A6uQraRruWbdo1roM4RS1Cq8JFbpNcxRD62BxYz2bgMyB8gxFRA2Z7bwMbCELw.png)
    
    ![](https://staticfiles.gleap.io/ghelparticle/0lKdRpzlpxYep2up8oElLxcZtnc2GVYInnNlWDkaXWKftviU4UqdyS7PbO2lR3Y0NP2ElbSnVvz.png)
    
4.  In the Rate modal, add a new **Cost Rate** or **Bill Rate** based on the column selected:
    

-   **For Bill Rates**: Click **\+ Add New Bill Rate**, then select a predefined rate from the list. Make sure to select the desired currency.  
    To update or create new standard rates, click **Edit Standard Rate** at the bottom of the modal.
    
    ![](https://staticfiles.gleap.io/ghelparticle/Q8jzJmeLBN3MU09Vkw2lkiT7rxb3Jr2QYjd7NylUHJ87f3bAANqdKmiH8uYhJs5qG4LUcREx0fF.png)
    
-   **For Cost Rates**: Click **\+ Add New Cost Rate**, then enter a value into the **Enter Total Hourly Cost** field. Use the calculator at the top of the modal to help determine the appropriate cost based on **Yearly Pay**, **Hours/Year**, and **Overhead Factor**.
    
    ![](https://staticfiles.gleap.io/ghelparticle/p9IG1kZKPmMyi8LTFUvdveejwkYazYP82KekEAX0YuaQTakRBZXnlpNZoQN1kZ9ZYVAMliiwane.png)
    

5.  A confirmation modal will appear, prompting whether the updated **Open Role** Rates should be applied to all existing **Projects** and **Phases**, or only to new ones. Choose the option that aligns with the desired scope of impact, then click the corresponding action button to confirm.
    
    -   **Yes**: Applies the updated **Open Role** Rates to all existing **Projects** and **Phases**. This action **cannot be undone**.
        
    -   **No**: Keeps the current Rates for existing **Projects** and **Phases**, and applies the new Rate only to those created in the future.
        
        ![](https://staticfiles.gleap.io/ghelparticle/oZ3R308uMr04Ro37SiBuyU7ic3eCkU9dakrlnSog2TIkMt72cczXj6fJ1h1RmIPLU9IyOK6RMBR.png)
        
6.  The new Rate will be displayed on the modal. Click **Done** to close the modal.
    
    ![](https://staticfiles.gleap.io/ghelparticle/yujndjudhec4LwpcE2gasEijKfetKTqzjz5ZMN1pGe2VaoanY1Ce3GGAUBxLarjalJCm883vGOF.png)
    
    ![](https://staticfiles.gleap.io/ghelparticle/EUkRfrwfgT3YPXP61Byur9bWA8Ja86pRdQwcNLT25ues0TPd5atwNhT6GWx8n1gohOPMDc56YC6.png)
    
7.  The Rate now has been assigned to the Role or Work Category within the Rate Group.
    
    > **Warning:** If a Role or Work Category is not added to a Rate Group, or if no Rate is set, it will default to a **Rate of zero** when that Rate Group is applied to a Project.
    
    ![](https://staticfiles.gleap.io/ghelparticle/80zgykoZLjdwS8A3iZNEw1xkyIiXWPmly27XL315MbqBpNHZKBO9qgOY0s0m4pdBynGiaOy5yEy.png)