# How to add standard Work Categories to a Phase or Subphase on Project Schedule Modal?

Break down the project into smaller, more manageable chunks using Work Categories

A **Phase** can be divided into multiple **Work Categories**, which help define the type of work performed when entering time. **Work Categories** are also useful for **budget tracking** and **scheduling work plans**. Click the three-dot on the Phase that you want to add the Work Categories to.

1.  To add **Work Categories** to a **Phase** or **Subphase**, select **Add Schedule Item**, then choose **Add Work Category**.
    
    ![](https://staticfiles.gleap.io/ghelparticle/c5SG65WjiqO9bpNTqsnqAemZfanDoWvJO62BTX7XJAo7rHVqDvzvBGeT3OjfL3e5w4ECw26QP3b.png)
    
    > **Warning:** Work Categories can only be added to Phases when the Phase Time Tracking setting is configured to "Track Time By Work Category."
    
    ![](https://staticfiles.gleap.io/ghelparticle/zvqaFWLkPKZsfwVd9ZVNewPTu1AYkYs7Z6hSiJf5B6Lzl2hxeyrVwcg0kMA7TznFaSYXZdRg1IO.png)
2.  Select the desired **Standard Work Categories** from the list. Multiple **Work Categories** can be added at once. Click **Done** to confirm.
    
    [Learn more about how to add custom Work Categories](https://support.mosaicapp.com/en/articles/245-how-to-add-custom-work-categories-to-a-phase-or-subphase-on-project-schedule-modal.md)
    
    Click **Manage Standard Work Categories** to open a new page leading to [Org Settings > Standards > Work Categories](https://support.mosaicapp.com/en/articles/303-organization-settings-standard-work-categories.md).
    
    ![](https://staticfiles.gleap.io/ghelparticle/EInrycYuFiEOszpOXlDgEpCZ1SnaG2NVUdfURBZHROyu2hXmkFzwvhblRMg4CLpqbln6xg45Fd2.png)
    
3.  The newly added Work Categories will show under the Phase or Subphase.
    
    ![](https://staticfiles.gleap.io/ghelparticle/4v2TYvn2LZ3fAP3MotSc9AZ8IZZTLdtMHefXb0Upj0hUqFP0Rqlus8idH5B4ngeFoFOQxy7zvkm.png)